Water Works Lighting Installation
Editors Note: Thank you to Mill District resident Doug Verdier for capturing the installation of the long awaited lighting in Water Works park.
Twenty overhead electric lights are being installed along the walking path throughout Water Works Park from the woonerf and kids play area to the end of the park near the Pavilion building. About half of the lights have been installed so far, and the cone-shaped covers will direct the light downward onto the walkway.