North Loop Reconstruction & Pedestrian Improvements
Editor's note - This is an ongoing series of updates as the North Loop Reconstruction and Pedestrian Improvements project.
North Loop Reconstruction & Pedestrian Improvements
The North Loop Reconstruction & Pedestrian Improvements Project consists of two separate projects:
- A full street reconstruction along 3rd St N between 10th Ave N and 5th Ave N
- A pedestrian improvement project generally bounded by 10th Ave N on the north, 1st Ave on the south, West River Parkway on the east, and 4th St N on the west
North Loop Reconstruction Updates
WORK THIS PAST WEEK
5th Ave N
- Continuing water work at 5th and 3rd St N
- Began removing poor subgrade material and replacing with sand between 4th St N and 3rd St N
- Began storm sewer work
7th Ave N
8th Ave N
9th Ave N
3rd St N
- Continued water work between 8th Ave N and 5th Ave N
- Began salvaging brick pavers on the north side of 3rd St N between 10th Ave N and 7th Ave N
- Removal of east sidewalk & curb between 10th & 5th Avenue starting
WORK ANTICIPATED FOR THE REMAINDER OF THIS WEEK AND NEXT WEEK
5th Ave N
- Continuing water work at 5th and 3rd St N (8th Ave N to 5th Ave N)- there will be a temporary water shut off on the night of Monday July 22, 2019. If your property is effected, a notice will be placed on the door of your property in 48 hours’ in advance for impacted businesses, 24 hours’ in advance to impacted residences
- Continue the removal of poor soils -work will begin at 4th St N and move towards Washington, this work may impact traffic flow on 5th Ave N
- Continue with storm sewer work
- Start sanitary sewer work
7th Ave N
- Tentatively planning on placing the first lift of asphalt next Thursday and Friday (7-25 and 7-26)
- Begin concrete installation (curb and gutter placement and possibly driveway placement) will start the following Monday, 7-29
8th Ave N
- Tentatively planning on next Thursday and Friday (7-25 and 7-26) at Washington and 8th Ave N (possibly one pass along the entire stretch)
- If the first lift of asphalt is placed on 7/25 and 7/26, curb and gutter installation will follow at the intersection of Washington and 8th Ave N
- Access to properties between Washington and 3rd St N will partially reopen at Washington.
9th Ave N
- Finish placing aggregate base in preparation to place the first lift of asphalt at Washington and 9th Ave N
- Tentatively planning on paving 7-17 and 7-18 at Washington and 9th Ave N (possibly one pass along 9th Ave N)
- If the first lift of asphalt is placed on 7/25 and 7/26, curb and gutter installation will follow at the intersection of Washington and 9th Ave N
- Access to properties between Washington and 3rd St N will partially reopen at Washington.
3rd St N
- Install hydrants along 3rd St N
- Continue salvaging brick pavers between 10th Ave N and 7th Ave N, crews will start on the south ½ of 3rd St next week. The north side will be open to maintain 2 way traffic along 3rd
- Sidewalk and curb removals will begin on the north side of the street between 10th Avenue & 5th Avenue
- Pedestrian access will be maintained on the south side of 3rd St N
For more information on this project, visit the project website.
North Loop Pedestrian Improvements Updates
WORK THIS PAST WEEK
1st St N
- 3rd Ave N-water work started
- 4th Ave N- placed concrete on SW corner
- 2nd Ave N -SW corner removed
2nd St N NW Corner
- 4th Ave N – Removed Southside
- 5th Ave N – Completed north side, started removals on southside
- 8th Ave N - Started electrical work for Pedestrian Crosswalk system
4th Ave and W River Parkway
- Placed concrete on the SE corner
10th Ave N
- 4th St N – remove north side
WORK ANTICIPATED FOR THE REMAINDER OF THIS WEEK AND NEXT WEEK
1st St N
- 1st St N and 3rd Ave- Finishing water work, 9 have been hooded between 2nd Ave N and 3rd Ave N to maintain two-way traffic during the work. This work should be complete in a week or two.
- 3rd Ave N – Install hydrant
- 2nd Ave N -Install hydrant
- 8th Ave N – Pour remaining concrete
2nd St N
- 4th Ave N pour remaining concrete
- 5th Ave N pour remaining concrete
- 8th Ave N begin installing conduit for new pedestrian flasher system. Pour remaining concrete
4th Ave and W River Parkway
- Northside of Parkway pour remaining concrete
10th Ave
- 4th Street Pour Concrete on north Side
For more information on this project, visit the project website.
Miscellanious
Stakeholder Meeting -These meetings are informal, held biweekly and intended to offer residents and businesses on the job an opportunity to get construction updates, ask construction and access related questions.
Date/Time: July 24, 7:30 am to 8:30 am
Location: Corner Coffee 514 N 3rd St #102
Contact Information
Project Manager:
Stephanie Malmberg, stephanie.malmberg@minneapolismn.gov, 612-673-3365
Chief Field Inspector:
John Benjamin, john.benjamin@minneapolismn.gov, 651-443-1096