MPRB Survey Re: West River Road Slope Failure/Mudslide
Via a March 26 Minneapolis Park and Rec Board e-newsletter:
Please take a survey regarding the design of the permanent repairs of the slope failure/mudslide along West River Parkway that occurred on June 19, 2014. The survey can be found at https://www.surveymonkey.com/r/XW38ZS9.
The project will be bid in mid-April and repairs are scheduled to begin in mid-June. Construction is expected to take 3 - 4 months. West River Parkway will re-open when repairs are complete.
Deborah Bartels, Registered Landscape Architect
Project Manager – Minneapolis Park and Recreation Board
2117 West River Road
Minneapolis MN 55411 -2227
dbartels@minneapolisparks.org
612-230-6438 direct
Reader Comments